17 1/2 XHR S 8169 BS(24006) PDC Drill Bit High-RPM Design for Soft Formations
| Place of Origin | CHINA |
|---|---|
| Brand Name | XINGTONG |
| Certification | API、ISO 9001 |
| Model Number | 17 1/2 XHR S 8169 BS(24006) |
| Document | 17 1.2 XHR S 8169 BS(24006)...6).pdf |
| Minimum Order Quantity | 1 Picece(MOQ) |
| Price | Negotiable |
| Packaging Details | Standard Exported Package |
| Delivery Time | 15-45 Days |
| Payment Terms | L/C,T/T,D/P, |
| Supply Ability | Stable supply and support for bulk customization |
| Cutter Grade | GI | IADC Code | S222 |
|---|---|---|---|
| Body Type | STEEL | Face | 135 |
| Gauge | 32 | Updrill | 8 |
| Nozzle Type & Count | M*11 | Chip Removal Groove Area Ratio | 57.5% |
| API Connection | 7-5/8REG | Make-Up TQ | 65.5-86.1KN.m |
| Gauge Length | 142mm | Make-Up Length | 524mm |
| Approximate Shipping Weight | 289kg | Recommended Weight On Bit(Maximum Acceptable) | 16-20T |
| Total Flow Area | 1066mm^2 | ||
| Highlight | PDC drill bit 17 1/2 XHR,Xingtong drill bit S 8169 BS,PDC drill bit with warranty |
||
The XHR series is a high-RPM drill bit engineered for high-speed drilling operations in soft formations. Designed to maximize rate of penetration (ROP) in soft geological conditions, this drill bit utilizes advanced tooth geometry and hydraulic optimization to deliver superior rock breakage efficiency and rapid cuttings removal, resulting in significantly increased drilling speeds.
- Specifically designed for high-speed drilling applications in soft formations
- Hybrid matrix cutting teeth with optimized irregular geometry enhance rock-breaking efficiency while accelerating cuttings transport velocity
- CFD-optimized nozzles and flow passages provide superior cuttings-carrying efficiency during high-speed drilling operations
- High-strength steel body construction allows for thinner cutter blade thickness, preventing interference at the blade rear during high mechanical drilling rates
Ideal for drilling intervals in soft to medium-hard formations where accelerated penetration is required, with the objective of achieving maximum possible mechanical drilling rate.
